Tides is nearing completion. Enjoy the latest pictures from the jobsite!

view previous photos

 

A view of the Ravenel Bridge from Building One

A view of the Cooper River from Building One

Installing stone sub base in preparation for asphalt paving in front of Building One

Cabinetry in one of the Building One units

Finished bathroom in one of the Building One units

A kitchen in one of the Building One units ready for appliances and final detailing

Architectural Cast Stone being lowered by crane and installed on Building Three

May 2007 Aerial Photograph of Tides site

May 2007 Aerial Photograph of Tides site

May 2007 Aerial Photograph of Tides site

May 2007 Aerial Photograph of Tides site - Building One with Amenities Building and edge of Building Two

December 2007 Aerial Photograph of Tides - all buildings to full height

December 2007 Aerial Photograph

December 2007 Aerial Photograph

December 2007 Aerial Photograph

December 2007 Aerial Photograph

December 2007 Aerial Photograph

View of the Ravenel Bridge from the Tides pool area

Landscaping

Building Two

Building One

Building One (LEFT), Building Two (RIGHT), and Amenities Building (middle)

 

view previous photos